Customization: | Available |
---|---|
Certification: | ISO9000 |
Transmission Type: | Manual |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Wheel base(mm) | 4275+1400 |
Max speed(km/h) | 90 |
Engine | WP10NG336E51 |
Rated power(kw/HP) | 247 / 336 |
Maximum output torque(N.m )/rpm | 1450 / 1200~1500 |
Displacement(L) | 9.726 |
Displacement emission grade | Euro V |
Gear box | Fast 9JS135 |
Clutch | Eaton Φ430 clutch |
Steering gear | ZF Technical steering |
Front axle | 7.5T MAN Technical steering shaft |
Rear axle | 16T STR Multi-leaf spring + two riding bolts |
Suspension | Multi-leaf spring + two riding bolts |
Tyre | 12.00R20 Radial tire |
Cooling | Dongfeng Aluminum Water Tank |
Electrical system | 1.Single wire 24V negative ground 2.Two DC 12 volt maintenance free batteries (165Ah) |
Cab | Delong F3000 mid-length flat-top cab |
Hydraulic main seat, four-point hydraulic suspension cab, electronically controlled automatic constant temperature air conditioner, manual window shaker, manual flip, Fleetguard air filter, metal bumper | |
Fuel tank(L) | 4X200+4X80 L carbon steel |
Mixture Tank capacity | 10cbm |
Founded in 2013, Zhengzhou Dongfeng Mid-South Enterprise Co., Ltd, specializes of international export business for commercial & passenger vehicles, construction and agriculture machinery, spare parts and so on. Now our cooperating manufacturing base covering the concrete mixing station, cranes, wheel loaders, excavators, forklifts, road rollers, farm tractors and agricultural machinery, and other wide range and variety of products series, with high quality, excellent service marketing strategy, we have been in the international business with significant market share.
Our products has exported to Cambodia, Philippines, Thailand, Indonesia, Bangladesh, Pakistan, Iran, Lebanon, Saudi Arabia, Qatar, Iraq, Oman, Yemen, Nigeria, Djibouti, Sudan, Congo, Zambia, Kenya, Ghana, Fiji, Cuba, Colombia, Uruguay, Bolivia Dominica, Hati, Peru and so on more than 60 countries since the establishment.
Q1. What is your terms of payment?
A: 40% prepaid as deposit by T/T, the balance of 60% should be cleared before delivery.
Q2. What is your terms of delivery?
A: EXW, FOB, CFR, CIF...
Q3. How about your delivery time?
A: Generally, it will takes 7 days after receiving your payment. The specific delivery time depends on the items and the quantityof your order.
Q4. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q5: How do you make our business long-term and good relationship?
A. We keep good quality and competitive price to ensure our customers benefit ;
B. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.